Gokul S Nandanam Block A
Gokul S Nandanam Block A is a residential project by Gokul Constructions in Bowrampet Gram Panchayat, Dundigal Gandimaisamma, Medchal-Malkajgiri district, Telangana. It is registered with the Telangana RERA as P02200001143 (status: On-Going Project). The approving authority named in the filing is HMDA. The promoter filed a total site area of 957 sq m (0.2 acres) and 1 building on the approved plan. The proposed date of completion is 31/12/2019.
More from Gokul Constructions · 4 projects →
Description
Gokul S Nandanam Block A is a residential apartment project recorded with TG-RERA as ongoing. The filing records 20 units in 1 tower, with 5 floors and a land area of 957.07 sq m; its proposed completion date is 31/12/2019.
- Project type
- Residential (apartment)RERA filing
- Units
- 20RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 957.07 sq mRERA filing
- Possession
- 31/12/2019RERA filing
- Status
- On-Going ProjectRERA filing
Configurations & sizes
The project is configured as 2BHK apartments; carpet areas measured from the approved floor-plan drawings range from 88.9 to 98.2 sq m, and should be verified against the drawings. The TG-RERA filing records 20 units, 13 booked and a saleable area of 139.27 sq m.
| Type | Carpet | Saleable | Source |
|---|---|---|---|
| 2BHK | 138.75 | 139.27 sq m | RERA filing |
Amenities
The disclosed amenities include a park/green strip and generator, alongside listed infrastructure such as water supply, sewerage, rainwater harvesting and street lighting.
- Green Strip/TOT LOT/Park
- GENERATOR
Location & connectivity
The project is in Bowrampet, Dundigal Gandimaisamma, Medchal-Malkajgiri. Nearby listings place Silver Oaks International School 0.4 Km away; Sri Chaitanya Junior Collage, Shikhara School, Slate International School and Bowrampet Bus Stop are each 2.0 Km away, and Snigdha Ayurvedic Hospital is 2.5 Km away.
- Sri Chaitanya Junior Collage2.0 Km
- Silver Oaks International School0.4 Km
- Shikhara School2.0 Km
- Slate International School2.0 Km
- Bowrampet Bus Stop2.0 Km
- Snigdha Ayurvedic Hospital2.5 Km
Promoter
The promoter is GOKUL CONSTRUCTIONS, a partnership. The developer’s official website is not identified in the digest, and the developer lists 13 other registered projects. The named architect is P AKHILA REDDY and the structural engineer is CHENNA RAYUDU VARIKUTI.
Additional details
Sources & web results
- Gokuls Nandanam in Bowrampet, Hyderabadmagicbricks.com
- Gokuls Nandanam RERA Details - P02200001143, ...squareyards.com
- GOKUL S NANDANAM BLOCK A Hyderabadaurumproptech.in
- GOKUL S NANDANAM BLOCK A (Telangana) Report & Status ...realestatereports.in
- GOKUL S NANDANAM BLOCK B Hyderabadaurumproptech.in
- Gokul S Nandanam Block A — RERA filing & developer record ...buildersandprojects.com
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- GOKUL S NANDANAM BLOCK A
- Developer / Promoter
- GOKUL CONSTRUCTIONS
- Project type
- Residential
- RERA Registration No.
- P02200001143
- Registration Status
- On-Going Project
- Approved on
- 01/12/2017
- Proposed completion
- 31/12/2019
- Approving authority
- HMDA
- Total site area
- 957 sq m (0.2 acres)
- Approved built-up area
- 2,721 sq m (0.7 acres)
- Buildings (approved plan)
- 1
- Locality
- BOWRAMPET GRAM PANCHAYAT, Bowrampet
- Mandal
- Dundigal Gandimaisamma
- District
- Medchal-Malkajgiri
- PIN code
- 500043
- Documents on File
- 9
Other registrations of Gokul S Nandanam
Frequently asked questions
Is GOKUL S NANDANAM BLOCK A registered with Telangana RERA?
Yes. GOKUL S NANDANAM BLOCK A is registered with the Telangana Real Estate Regulatory Authority as P02200001143; the registration status is On-Going Project.
Who is the developer of GOKUL S NANDANAM BLOCK A?
The promoter named in the RERA registration is GOKUL CONSTRUCTIONS.
Where is GOKUL S NANDANAM BLOCK A located?
GOKUL S NANDANAM BLOCK A is in BOWRAMPET GRAM PANCHAYAT, Bowrampet, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).
When will GOKUL S NANDANAM BLOCK A be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2019. This is the promoter's declaration, not a guarantee.