Team4 Nyla
Team4 Nyla is a residential project by Team4 Life Spaces LLP in Miyapur, Serilingampally, Rangareddy district, Telangana. It is registered with the Telangana RERA as P02400003672 (status: New Project). The approving authority named in the filing is GHMC. The promoter filed a total site area of 24,431 sq m (6.0 acres) and 4 buildings on the approved plan. The proposed date of completion is 10/10/2027.
Description
TEAM4 NYLA is a residential apartment project recorded as a New Project with TG-RERA. Its filing records 936 homes across three towers, each with 35 floors, on 24,430.94 sq m of land, and gives a proposed completion date of 10 October 2027.
- Project type
- Residential (apartment)RERA filing
- Units
- 936RERA filing
- Towers
- 3RERA filing
- Floors
- 35RERA filing
- Land area
- 24430.94 sq mRERA filing
- Possession
- 10/10/2027RERA filing
- Status
- New ProjectRERA filing
Gallery



















Configurations & sizes
For 2BHK homes, carpet area measured from the approved drawings is 72.2–78.6 sq m; this is a drawing measurement, not a RERA disclosure, and should be verified against the drawing. The TG-RERA filing records 104 such homes, 35 booked, with saleable area of 111.48 sq m. For 3BHK homes, carpet area measured from the approved drawings is 101.7–112.5 sq m; this is a drawing measurement, not a RERA disclosure, and should be verified against the drawing. The filing records 623 homes, 251 booked, with saleable area of 169.31 sq m; for 2.5BHK homes, it records 209 homes, 93 booked, with saleable area of 123.56 sq m.
| Type | Saleable | Facing | Source |
|---|---|---|---|
| 3BHK | 169.31 sq m | RERA filing | |
| 2.5BHK | 123.56 sq m | RERA filing | |
| 2BHK | 111.48 sq m | RERA filing | |
| 2, 2.5 and 3 BHK apartments | 1200 Sft | N | Developer site |
| unit | 1200 – 1880 Sft | Developer site |
Amenities
The developer describes a broad mix of indoor and outdoor amenities, including a clubhouse, recreation and fitness facilities.
- Clubhouse · 45,000 sq ft
- Green Strip/TOT LOT/Park
- Community Buildings
- Aggregate area of recreational Open Space
- Spa
- Meditation Room
- Yoga Studio/ Aerobics
- Multipurpose Hall
- Tuition Room
- Guest Suites
- Hobby Room
- Coffee Shop & Restaurant
- Party Terrace
- Preview Theatre
- Waiting Lounge
- Swimming pool
- Deck-side seating
- Banquet hall
- 45,000 sq ft Club NYLA
- walk track and fountain
- outdoor gym
- Carrom
- Indoor Table Tennis
- Hobby Area
- Children's Play Area
- Business Lounge
- Conference Room
- Grand Entrance Lobby
- Double Height Stilt
- Jogging Track
- Mini Golf
- Party Lawn
- Seating Area
- Skating Loop
- Bird Watching Deck
- Child Play Area 2
- Co-working Space
- Community Lounge
- Gaming Lounge
- Gym
- Library
- Out Door Gym
- Outdoor Play Room
- Relaxation Zone
- Youth Hangout
- Billiards
- Club House
- Towers
- Floors
- Land Area
- RERA Number
Specifications
- bathrooms
- Wash basins, EWC, concealed system, single lever CP fittings of reputed brands.
- bathrooms
- Provision for fixing geysers.
- bathrooms
- Glazed ceramic tile dado up to 7ft height.
- doors
- Main Door: Manufactured Teak wood frame with flush shutter of melamine matt polish, fixed with reputed make hardware.
- doors
- Internal Door: Manufactured hardwood door frames & laminated shutters, fixed with hardware of reputed brand.
- doors
- French Doors: UPVC sliding door of 3 track frame with provision for mosquito mesh.
- electrical
- Concealed internal wiring with fire retardant.
- electrical
- PVC insulated copper wires for all points.
- electrical
- Modular type switches and sockets.
- electrical
- Light/ Fan points in every room as per architect’s design.
- electrical
- Power points in kitchen for dishwasher/ grinders/ mixers/ cooking range/ exhaust chimney/ microwave etc. and in wash area for washing machine as per the architect’s design.
- electrical
- Exhaust fan provision in toilets.
- electrical
- Electrical provision in all bedrooms for split air-conditioners.
- electrical
- No provision for window air-conditioners.
- electrical
- Separate metering for each unit for normal supply and DG supply.
- electrical
- Earthing for every unit as per standards.
- electrical
- 3 phase power connection of required load for each unit depending on size of apartment.
- electrical
- Copper piping for A/C’s and gas pipeline will be charged extra as per actuals.
- fire safety & gas
- Supply of piped gas, subject to feasibility in all flats.
- fire safety & gas
- Fire safety features as per fire department norms & regulations.
- flooring
- Living, drawing, dining, all bedrooms & kitchen: 800mm X 800mm size double charged vitrified tiles.
- flooring
- Bathrooms: Acid-resistant, anti-skid ceramic tiles.
- flooring
- All Balconies: Ceramic tiles.
- flooring
- Corridors: Vitrified tiles.
- generator
- 100% DG set back up with acoustics enclosure and AMF.
- kitchen
- Provision for municipal & borewell water connection.
- kitchen
- Provision for water purifier.
- kitchen
- Provision for chimney.
- kitchen
- Provision for dishwasher.
- Land Area
- 6.02 acres
- lifts
- Reputed make automatic elevators.
- painting
- Internal: 2 coats of emulsion paint over putty finished surface/ primer coat.
- painting
- External: Texture finish and weatherproof emulsion paint or any other finish as per the architect’s design.
- security/BMS
- Solar powered security fence for total compound wall.
- security/BMS
- 24/7 security guards.
- security/BMS
- Surveillance cameras at the main security and entrance of each block & clubhouse to monitor.
- structure
- R.C.C. Framed Structure to withstand wind & seismic loads.
- structure
- R.C.C. Shear Wall Structure to withstand wind & seismic loads.
- structure
- Concrete blocks for non-structural members.
- Structure
- 35-floor high-rise
- telecom/internet/cable TV
- Telephone point in living room.
- telecom/internet/cable TV
- Intercom facility in all flats.
- telecom/internet/cable TV
- Provision for cable connection in drawing room, living room & all bedrooms.
- telecom/internet/cable TV
- Provision for internet connection in living room.
- utility
- Provision for washing machine.
- utility
- Glazed ceramic tiles dado up to 3ft height.
- windows
- UPVC window as per the architect’s design.
- WTP & STP
- Sewage Treatment plant as per norms provided inside the project. Part of the treated sewage water will be used for the landscaping and flushing purpose.
- WTP & STP
- Treated water made available through an exclusive water softening and purification plant.
Location & connectivity
The developer places the project in Mayuri Nagar, Miyapur. Nearby locations listed in its marketing include Miyapur Metro Station (4 minutes), Miyapur Crossroads (1 minute), KPHB Forum Mall (11 minutes), Kondapur (15 minutes), Hitec City (18 minutes) and Financial District (20 minutes).
Promoter
The promoter is TEAM4 LIFE SPACES LLP, an LLP. Its official website is https://team4lifespaces.com/nyla-luxury-apartments-miyapur-hyderabad/; the named architect is K PANDU RANGA MURTHY and the named structural engineer is RAJEEV DUA.
Additional details
Filed vs marketed
The TG-RERA filing records land area of 24,430.94 sq m, while the developer's site shows 6.02 acres; for the 2, 2.5 and 3 BHK mix, the site shows 1,710–1,880 sq ft saleable area, while its other displayed figure is 1,200 sq ft, facing north.
- Land area: team4nyla says 6 Acres; we show 6.02 acres. team4nyla
- Unit config 2, 2.5 and 3 bhk apartments: team4nyla says saleable 1,710 – 1,880 Sq.ft; we show saleable 1200 Sft, facing N. team4nyla
Sources & web results
- TEAM4 Nyla Miyapur – 2, 2.5 & 3 BHK Luxury Flats in Miyapur ...team4nyla.com
- Team 4 Nyla in Miyapur, Hyderabadmagicbricks.com
- housing.com
- Team4 Nyla | Hyderabad Apartments propertiesjllhomes.co.in
- 78+ Flats for Resale in Team4 Nyla, Miyapur Hyderabad99acres.com
- Team4 Nyla in Miyapur, Hyderabadpropertypistol.com
- Team4 Nyla Luxury Apartments in Miyapur | 2 & 3 BHK Flatspropenu.com
- TEAM4 NYLA Hyderabad – RERA No. P02400003672aurumproptech.in
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- TEAM4 NYLA
- Developer / Promoter
- TEAM4 LIFE SPACES LLP
- Project type
- Residential
- RERA Registration No.
- P02400003672
- Registration Status
- New Project
- Approved on
- 10/10/2021
- Proposed completion
- 10/10/2027
- Approving authority
- GHMC
- Total site area
- 24,431 sq m (6.0 acres)
- Approved built-up area
- 205,548 sq m (50.8 acres)
- Buildings (approved plan)
- 4
- Locality
- MIYAPUR, Madina Guda
- Mandal
- Serilingampally
- District
- Rangareddy
- PIN code
- 500049
- Documents on File
- 77
Frequently asked questions
Is TEAM4 NYLA registered with Telangana RERA?
Yes. TEAM4 NYLA is registered with the Telangana Real Estate Regulatory Authority as P02400003672; the registration status is New Project.
Who is the developer of TEAM4 NYLA?
The promoter named in the RERA registration is TEAM4 LIFE SPACES LLP.
Where is TEAM4 NYLA located?
TEAM4 NYLA is in MIYAPUR, Madina Guda, Serilingampally, Rangareddy, Telangana (500049).
When will TEAM4 NYLA be completed?
The promoter's proposed date of completion filed with RERA is 10/10/2027. This is the promoter's declaration, not a guarantee.