thePropCheck AI property due diligence
Sign in

Thimu Kings Court Block A

Thimu Kings Court Block A is a residential project by Thimu Avenues in Kaziguda, Medchal, Medchal-Malkajgiri district, Telangana. It is registered with the Telangana RERA as P02200008066 (status: New Project). The approving authority named in the filing is GHMC. The promoter filed a total site area of 749 sq m (0.2 acres) and 1 building on the approved plan. The proposed date of completion is 22/02/2027.

🔒 Title & legal checks
Title and legal checks are available for this project.
To see the full title details and any court records, please sign in

Description

The TG-RERA filing describes a residential apartment project with 20 units in one tower, with five floors on 749.45 sq m of land. It is recorded as a New Project, with proposed completion on 22 February 2027.

Project type
Residential (apartment)RERA filing
Units
20RERA filing
Towers
1RERA filing
Floors
5RERA filing
Land area
749.45 sq mRERA filing
Possession
22/02/2027RERA filing
Status
New ProjectRERA filing
Photo from housing.com
Photo from housing.com

Configurations & sizes

For the 2BHK configuration, carpet area measured from the approved floor-plan drawings ranges from 59.5 to 70.9 sq m (median 61.3 sq m); this is a drawing-based measurement, not a RERA disclosure, and should be verified against the drawing. The TG-RERA filing records 20 units, 13 bookings and saleable area of 115.09 sq m; the developer's marketing also advertises 3 BHK Flats.

TypeSaleableSource
2BHK115.09 sq mRERA filing

Amenities

The developer's marketing describes shared recreational and community amenities, while the RERA disclosures include water conservation and rainwater harvesting.

14 amenities
  • Club House
  • Jogging and Strolling Track
  • Swimming Pool
  • Lift
  • Security
  • Reserved Parking
  • Gymnasium
  • Indoor Games Room
  • CCTV Camera
  • Kids play area
  • Community Hall
  • Power backup
  • Normal park
  • Central green

Specifications

DOORS
Main Door frames & Shutters will be with Brown Teak-wood and Toilet Doors are WPVC
ELECTRICAL
All concealed wiring using PVC fire retardant copper wire(Havells Brand) with PVC conduits and Schneider Zencelo or Equivalent modular switches with sufficient points for power and lighting. Provision for Air condition points in all rooms.
flooring
Vitrified Tiles
FLOORING
Good Quality Vitrified SOMANY Tiles for living, dining & bed rooms. Lift Lobby & Common areas flooring with good quality granite.
GENERATOR
Stand by generator of reputed make Ashok Leyland to be provided for emergency use in common areas, lift & with 6KVA power backup for each apartment.
KITCHEN
Provision For Open Kitchen.
LIFTS
1 No of 8 Passenger Capacity Lift per Block of Johnson make (Auto-Matic)
PAINTING
Internal walls will be treated with Plastic Emulsion Paint and external walls with Weather coat Long Life Berger Paints.
PLASTERING
All internal walls and ceilings are provided with lime finish, and external walls with rough sponge finish.
STRUCTURE
Total Red Brick Construction Grade-A1
TOILETS
Taps, Commode, Wash basin are Somany Brand,Wash Room Flooring are Anti-Skid tiles, side walls Covered up to 8 feet’s.
walls
oil-bound distemper walls
WATER SUPPLY
Pneumatic Water Supply System with electric pump for continuous water supply. Bore well provided to supplement corporation water.
WINDOWS
All windows provided with UPVC three track sliding shutters with mosquito mesh

Location & connectivity

The marketed address is Survey No. 34, Doolapally, Kompally, Gundlapochampally, Hyderabad 500100; the RERA record identifies the locality as KAZIGUDA. Nearby listings include Unicent School (0.3 Km), Sadhu Vaswani International School (0.5 Km), D-Mart (0.6 Km) and Roma Hospital (1.2 Km).

Gundlapochampally, Medchal, Medchal-Malkajgiri
📍 Open in Maps
Nearby
  • Unicent School0.3 Km
  • Sadhu Vaswani International School0.5 Km
  • Pearson School0.7 Km
  • Malla Reddy Engineering College3.7 Km
  • Narsimha Reddy Engineering College3.7 Km
  • D-Mart0.6 Km
  • Decathlon-Kompally3.6 Km
  • Runway 9 Go Karting0.5 Km
  • Cine Planet Multiplex0.5 Km
  • Asian Cine Planet0.5 Km
  • Roma Hospital1.2 Km
  • Aashrita Hospital Kompally1.0 Km

Promoter

THIMU AVENUES is the promoter, a partnership with an official website at https://thimuavenues.com/; 11 other registered projects are recorded. The named architect is S R J RAO KALIPATNAPU, and the named structural engineer is KASISISWANATH SADASIVUNI.

THIMU AVENUES
11 other projects on record
Official website ›Developer site

Additional details

Launched 01 February 2024magicbricks

Filed vs marketed

The TG-RERA filing records 20 units and one tower, while Magicbricks shows 160 units and eight towers; for possession, the filing gives 22/02/2027, while Magicbricks shows 01 December 2028 and Square Yards shows 22-Feb-2027.

  • Possession: squareyards says 22-Feb-2027; we show 01 December 2028. squareyards

Public RERA registration record

Telangana RERA, as filed by the promoter.

Registered name
THIMU KINGS COURT BLOCK A
Developer / Promoter
THIMU AVENUES
Project type
Residential
RERA Registration No.
P02200008066
Registration Status
New Project
Approved on
22/02/2024
Proposed completion
22/02/2027
Approving authority
GHMC
Total site area
749 sq m (0.2 acres)
Approved built-up area
1,882 sq m (0.5 acres)
Buildings (approved plan)
1
Locality
KAZIGUDA, Gundlapochampally
Mandal
Medchal
District
Medchal-Malkajgiri
PIN code
500043
Documents on File
18

Other registrations of Thimu Kings Court

Frequently asked questions

Is THIMU KINGS COURT BLOCK A registered with Telangana RERA?

Yes. THIMU KINGS COURT BLOCK A is registered with the Telangana Real Estate Regulatory Authority as P02200008066; the registration status is New Project.

Who is the developer of THIMU KINGS COURT BLOCK A?

The promoter named in the RERA registration is THIMU AVENUES.

Where is THIMU KINGS COURT BLOCK A located?

THIMU KINGS COURT BLOCK A is in KAZIGUDA, Gundlapochampally, Medchal, Medchal-Malkajgiri, Telangana (500043).

When will THIMU KINGS COURT BLOCK A be completed?

The promoter's proposed date of completion filed with RERA is 22/02/2027. This is the promoter's declaration, not a guarantee.

More projects in Gundlapochampally